Outside Editor Joining Mid Project

Chris Salters
Owner + Lead Editor

How Does an Outside Editor Join a Production's Post Team Mid-Project?

An outside editor joins editorial by working inside the production's existing toolset, review structure, and chain of command. That new editor adds capacity to the in-house team on an on-demand basis. Sawtooth Post is built with a remote-forward and crafted editor mentality. We're available to slot into productions as an extra hand and have mechanisms in place for our clients to pull their preferred editors into our facility's infrastructure without reinventing workflows.

Why Do Production Teams End Up Short-Handed Mid-Project?

Post-production schedules may not always scale with the footage they were originally built to handle. For example a documentary or unscripted series with 60-plus interviews and 100-plus days of coverage can stretch the capacity of a small editorial team, cutting against a fixed delivery date, especially when interviews and B-roll keep arriving mid-project.

The staffing math that worked at kickoff might need to change by mid-production as expanding scope can push the actual workload past what the original headcount can reasonably absorb. Running editorial that's too lean leads to lower quality output and, at its worst, burnout. An experienced outside editor can help alleviate some of that stress.

What Changes When an Outside Editor Joins Mid-Project?

An outside editor joining mid-project should be able and ready to adopt to the production's existing systems that are already in motion. That means working inside the same workflow the rest of the team has already built, so an incoming editor must be well versed and experienced to dive in without interrupting the processes and people already in place. It's important that post facilities keep this option in mind from the start and build workflows that can accommodate the addition of local or remote editors without having to troubleshoot solutions when it's crunch time.

What Does Mid-Production Editor Integration Look Like?

In week one, an onboarding editor's job is mostly absorption. Think access setup, project familiarity, and one-on-one handoffs with other editors. They're getting up to speed, so output in week one is possible but limited on larger projects. That trade-off buys speed in weeks two and three. The priority is gaining project understanding and not breaking what's already working. By weeks two or three, the editor should be operating at full capacity inside the existing pipeline, helping the team get back on schedule.

FAQ
Questions + Answers
  • Can a post house augment its team on the fly?

    With the right systems already in place, adding editors mid-project is not a challenge, but when post teams are tasked with new editors as a surprise, it can cause more problems than it solves. Experienced editor augmentation adds capacity and breathing room inside an existing post-production pipeline with tight deadlines.

  • How long does it take an outside editor to get up to speed on an existing cut?

    Experienced editors reach full working speed inside an unfamiliar shop within two to three weeks. Footage volume, project complexity, onboarding processes, and how well the media is organized can all affect that timeline.

  • Do you make the cut?